» Viewing User: Sirslothalot // 1365 x 2048 // 856 kiB

Score: 6673 / Images: 317 / Website: Nicht den Hauch einer Schna
3.5 after 4 Votes
20. Sep 2016 00:55
Tags: NASA Raketen Hangar Wartung access platform
Post in Forum:

4 Comments:

Sirslothalot 9 months ago
...und Hauptsache bei Kerbal fliegt das LCC in die Luft. Schon öfter vermisst; es gab von playstation ein Abriss/Zerstörungsspiel, bei dem man mit Bots Gebäude möglichst schnell platt machen musste. Hätte oft gepasst. #lustigweilkaputt
BS 9 months ago
aja !?
BS 9 months ago
"A heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida.
In view below are the six levels of previously installed platforms.
The D platform will be installed on the south side of the high bay.
The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1.
The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

Photo credit: NASA/Kim Shiflett
NASA image use policy."